This page is generated from the project's working notes. It records a real retrofit in progress, corrections included. Anything marked ๐Ÿ”ด or โš ๏ธ is unresolved or carries a caveat - read those before acting.

Physical layout - pendant, pushbuttons, cabinet, terminals, machine

2 September 2026. From wiring diagram sheets 36 (COLL. PULSANTIERA), 37 (PULSANTIERE B.M.), 38 (LAY-OUT Q.E.), 39 (MORSETTIERE Q.E.) and 40 (LAY-OUT B.M.).

These five close the 40-sheet Q.E. section.

The pendant - sheet 36

DISPOSIZIONE PULSANTIERA. Two rows of controls:

Top row

Symbol Device Type Wires
lightning (lamp/indicator)
tool (lamp/indicator)
RESET // SB15 Yellow pushbutton ZB4-BA5 75/18, 14A/58, 103/89, 14A/14A
?X HLX Red lamp 194 / 3
?Y HLY Red lamp 196 / 3
?Z HLZ Red lamp 198 / 3
- SB2 White pushbutton 14 / E130 - JOG minus
~ SB3 White pushbutton 14 / E131 - FAST
+ SB4 White pushbutton 14 / E132 - JOG plus
round SE1 Mushroom E-stop 124 / 129

Bottom row

Symbol Device Type Wires
START SA2 Illuminated 2-position selector, white 600/3, Y1/Y2 123/124, 2/600
circle SB1 Illuminated white pushbutton 17A/3, Y1/Y2 127/128, 2/122
hand SA1 2-position key selector 2/193, 17/17A
triangle SBEC White pushbutton 14 / E129 - END CYCLE
dashed rect SB6 Red pushbutton 801 / E107 - on the HOLD chain
slider FR1 Feed override switch +24V giallo, BIT0-3 verde/marrone/grigio/bianco
dial R6 Spindle speed potentiometer to the inverter FC/FR/FS

๐Ÿ”ด R6 is a manual spindle speed potentiometer

The device list calls it SPINDLE TECNOS, KIT SPINDLE LUNGO + CAVI (025TEC0027). Sheet 5 draws it as a 2.5 kohm potentiometer with a 330 kohm series resistor across the inverter's FC (common), FR (SPEED REF 0-10V) and FS (+12 V, 20 mA) terminals - and the CNC's analog output from CONN.S pins 15 (marrone) and 8 (bianco) lands on the same node, on wires 23 and 24, referenced to MASSA C.N.

โš ๏ธ This has to be resolved before the spindle control is designed. Whether the pot is the primary speed reference, a trim on the CNC's output, or a maximum-speed limit changes whether LinuxCNC's S word controls spindle speed at all. One zoomed screenshot of the -R6 block on sheet 5 settles it.

Machine pushbutton stations - sheet 37

Station Position Devices
SX (left) Machine, left end SB8 black (800/14), TAPPO blank plug, SB603 green illuminated + 24 Vdc LED (E101/14, lamp 7/A208)
DX (right) Machine, right end SB613 green illuminated + LED (E102/14, lamp 7/A237), TAPPO, SB7 black (801/800)
- Machine SE2 mushroom E-stop (28/29)
- Machine SB201 green illuminated + LED (E118/14, lamp 7/A240) - manual tool release

So the zone start buttons are green illuminated buttons at each end of the machine, lit by OF.8 (zone A) and OF.37 (zone D). SB7 and SB8 are the black buttons in the HOLD chain with SB6 on the pendant.

๐Ÿ”ด There is no rope switch on this drawing

The complete set of emergency devices in the whole 40-sheet section:

Device Type Where
SE1 Mushroom ZB4-BS844 Pendant, wires 124/129
SE2 Mushroom ZB5-AS844 Machine, wires 28/29 on X3
SB6, SB7, SB8 N.C. buttons in series Pendant and the SX/DX stations, forming the HOLD chain to EIN7
PONTE A link, -X3 29 to -X3 30 Sheet 11

๐Ÿ”ด Revised 2 Sep: -SQF1 is very likely the rope switch

Grant's point that it may be labelled as a door or another safety circuit sent this back to sheet 11, where there is a device passed over on the first read:

-SQF1, drawn dashed inside the =BM+X3 group, contacts 21-22, with wire 30 bridging it, in series with the auxiliaries chain.

In Italian a rope-pull switch is an interruttore a fune. SQ is the position-switch prefix and F reads as fune - rope. SQF1 = "rope switch 1".

The location fits: =BM+X3 is the SCATOLA ELETTRICA SOTTOPIANO, the box under the table running the length of the machine, which is exactly where a rope switch terminates.

Where to look: terminals X3:28, X3:29, X3:30 and X3:50 in the under-table box. SE2 sits on 28/29; SQF1 and -SP1 on 30/50. Whatever the switch is labelled on the machine, its wires land there.

โš ๏ธ Still worth confirming physically, and the general caution stands: assume the drawing may not capture every later modification. But the machine is better documented than the first reading suggested.

Cabinet layout - sheet 38

LAY-OUT Q.E. is a physical map of the cabinet. Reading left to right:

Zone Contents
Far left -UF1, -UF2, -UF3 stacked; below them -CH1 hour counter, -G3 24 Vdc PSU, -XS1 the PC mains socket
-UF4, -UF5, -UF6 stacked
-IF1 to -IF6 in a single row
-KAMF, -KAA, -KA, -KA2; above them -KA560, -KA562, -KAX, -KAY, -KAZ, -KAF, -KA4
Centre Terminal blocks X1A-X1D; fuses F1-2-3, F7-8, F9, F10, F11-12, F13, F14, F15; converters OPT1, OPT2, OPT11-OPT16
Breakers QF101, QF601, QFX, QFY, QFZ, QF560, QFINV, QFRI
Contactors KMI, KM101, KM560, KMX, KMY, KMZ, KM601L/T/Y; QM1 the main isolator (note: MONTARE QMI SU SUPPORTO)
Right -U1 inverter; drives -UX, -UY, -UZ; -U560 Panasonic; terminal X1C
Far right -KM200, terminals X1G/X1E, transformers -T3, -T2, -C1 capacitor, -G2 bridge

Note on the sheet: USCITA CAVO ALIMENTAZIONE M68K (-CNC) L=60cm DA CANALA - the controller's supply cable leaves the trunking 60 cm long.

โœ… This validates the retrofit boundary

The IF1-IF6 and UF1-UF6 modules are separate DIN-rail units in the cabinet, not inside the Monoscheda box. The four 26-way ribbons run from the Monoscheda's front panel to those modules.

That is exactly the boundary set in CLAUDE.md ยง5.4: Mesa connects at the ribbon, the modules and every field wire stay untouched. Confirmed from the drawing rather than inferred.

Cabinet terminal blocks - sheet 39

Strip Purpose Terminals
X1A Control commons and distribution 8B, 14A x2, 14 x4, 12 x2, 8A, 8, 7 x3, 15, 16, 2, 3 x2, 630/631, 30, with jumper bars linking each group
X1C RES. FR. ASSE Z 2 terminals, BK2
X1D RES. FR. INVERTER 4 terminals: ZDU 4 x2, ZDU 2.5 x2 - to -R2
X1E 1 PANTOGRAFO 2 terminals ZDU 4 - spindle motor
X1P POMPA VUOTO U2, V2, W2, X2, Y2, Z2, 600, 601, PE - star-delta pump motor

X1A is where the control rails (7, 8, 8A, 8B, 12, 14, 14A, 15, 16, 2, 3) are distributed. That strip is the single most useful place in the cabinet to measure any control rail.

โš ๏ธ X1C is labelled RES. FR. ASSE Z (Z-axis braking or brake resistor) but no such resistor appears in the device list, which lists only -R2 (inverter, 30 ohm) and -RX (X axis, 75 ohm). Possibly provisioned and unused; check physically.

Machine layout - sheet 40

LAY-OUT B.M., a side elevation showing:

  • PROTEZIONE CE - the CE guard frame, drawn as a perimeter of posts and rails around the machine
  • PROTEZIONE NO CE / UL-CSA - the alternative guarding for non-CE markets
  • SCATOLA ELETTRICA SOTTOPIANO - electrical box under the table
  • SCATOLE ELETTRICHE ASSE Z - electrical boxes on the Z carriage
  • SCATOLA ELETTRICA - a further electrical box
  • ELETTROVALVOLE VUOTO - vacuum solenoid valves
  • ELETTROVALVOLE BATTUTE - datum/stop solenoid valves
  • QUADRO ELETTRICO - the cabinet, freestanding beside the machine

๐Ÿ”ด The machine junction boxes are the =BM+Xn terminal groups

The boxes on this layout are the =BM+X3, =BM+X4, =BM+X5 and =BM+X43 groups that every field device on sheets 16-28 carries.

So a device's terminal group names the physical box it lives in. Combined with the wire number from io-map.md, anything on this machine can be located without tracing a single wire.

The rope switch, if it runs along the machine, would be attached to the PROTEZIONE CE frame drawn here - which is consistent with it being a CE-compliance addition made after this drawing.

  • io-map.md - the wiring plan
  • device-list.md - part numbers for everything above
  • safety-and-enable-chain.md - the emergency and enable circuits
  • spindle-vfd.md - the R6 network on sheet 5